Home / Article

ESGold Confirms Merrill Crowe System as Optimal Processing Method for Montauban Gold-Silver Project

Burstable News - Business and Technology News October 31, 2025
By Burstable News Staff
Read Original Article →
ESGold Confirms Merrill Crowe System as Optimal Processing Method for Montauban Gold-Silver Project

Summary

ESGold Corp. has validated the Merrill Crowe closed circuit as the optimal processing path for all feedstock at its Montauban Gold-Silver Project, de-risking equipment procurement and supporting accelerated mill construction.

Full Article

ESGold Corp. (CSE: ESAU) (OTCQB: ESAUF) has confirmed that metallurgical work at its fully permitted Montauban Gold-Silver Project in Quebec validates the company's processing strategy, with the Merrill Crowe closed circuit emerging as the optimal processing path for all site feedstock, including railway tailings. The comprehensive testing program, supervised by Edmond St-Jean, P.Eng., and analyzed by ALS Global in Val-d'Or, represents a significant milestone in the project's development timeline.

Gravity separation tests conducted during the metallurgical evaluation revealed that concentrate grades were insufficient for direct gold and silver pouring, leading to the definitive conclusion that all material will be processed through the Merrill Crowe system during the final construction phase. This technical validation provides crucial certainty for the project's operational planning and equipment specifications, reducing potential processing uncertainties that often plague mining developments.

The confirmation of the Merrill Crowe circuit as the optimal processing method supports ongoing mill construction, which the company reports is progressing ahead of schedule. This accelerated timeline, combined with the de-risking of equipment procurement decisions, positions ESGold to potentially achieve production milestones sooner than initially projected. The company's infrastructure expansion continues concurrently, with notable progress on the gold room and laboratory facilities that will support future operations.

Complementing the processing advancements, ESGold has completed advanced 3D geological modeling that will guide an expanded exploration program at the Montauban property. Located 80 kilometers west of Quebec City, the flagship project serves as a model for responsible mining practices, combining near-term production potential with district-scale discovery opportunities. The integration of sophisticated geological modeling with confirmed processing methodologies creates a comprehensive development framework that enhances the project's overall viability.

For investors and industry observers seeking detailed information, the complete technical details are available in the full press release at https://ibn.fm/2WICY. The validation of processing methods represents more than just technical confirmation—it signals maturation of the project from exploration to development phase, potentially increasing investor confidence in the company's ability to execute its production timeline. In the broader mining sector, such metallurgical confirmations often precede significant valuation adjustments as projects demonstrate technical feasibility and move closer to revenue generation.

The mining industry continues to face challenges in project development timelines and processing efficiency, making ESGold's progress particularly noteworthy. The company's approach to combining traditional mining expertise with modern geological modeling and processing validation demonstrates a comprehensive strategy that could serve as a template for other junior mining companies navigating the complex path from exploration to production.

QR Code for Content Provenance

This story is based on an article that was registered on the blockchain. The original source content used for this article is located at InvestorBrandNetwork (IBN)

Article Control ID: 271167